GeoDome Theater Installation and Operation [email protected] TheaterInstallation and Operation GuideLast Updated: Novemb
GeoDome Theater Installation and Operation GuideProjection System SetupUnpacking1. Unfasten the locks to open the protective case.2. Remove remote co
GeoDome Theater Installation and Operation GuideSetting up the Stand 1. Lift the protective foam at the bottom of the case and remove the cable snake
GeoDome Theater Installation and Operation Guide4. Turn the stand upright and place the projection system on top of the stand so that it is solidly mo
GeoDome Theater Installation and Operation GuideProjection System First Light1. Turn the on projector using the remote control. 2. You should see the
GeoDome Theater Installation and Operation GuideTheater TeardownDeflating1. Once you are finished using your Theater, remove all equipment from the in
GeoDome Theater Installation and Operation GuidePacking Up1. Drag dome by suction fan hole until it folds in half along a line between the doorway and
GeoDome Theater Installation and Operation GuideAlternate Packing MethodAfter following steps 1-4 above, some customers prefer to “stuff” the OpenDome
GeoDome Theater Installation and Operation GuideTheater InformationThis section contains product specifications, troubleshooting tips, and support inf
GeoDome Theater Installation and Operation GuideTheater SpecificationsOPENDOME ADVANTAGES• Fully open doorway with no airlock• No rigid supports• No c
GeoDome Theater Installation and Operation Guidewww.elumenati.com Page 19
GeoDome Theater Installation and Operation GuideSystem OverviewIntroductionThis guide covers the installation and operation of the GeoDome Theater. T
GeoDome Theater Installation and Operation GuideProjection System SpecificationsOMNIFOCUS PROJECTION • Infinite depth of focus • Optimized pixel place
GeoDome Theater Installation and Operation GuideTheater SetupPreparationThe space requirements for the Theater are at least 25' x 25' in cle
GeoDome Theater Installation and Operation Guide3. Unfold the dome so that the light screen material is face-down on the floor. It will unfold to a ci
GeoDome Theater Installation and Operation GuideConnecting the Inflation Blower1. Remove both the inflation and ventilation fans from Case 2. The fans
GeoDome Theater Installation and Operation GuideConnecting the Screen Suction Fan1. Locate the hole at the top of the dome surrounded by Velcro. Posit
GeoDome Theater Installation and Operation GuideInflating1. Turn the blower on high.2. Let the Theater structure inflate. This should take about 5 min
GeoDome Theater Installation and Operation GuideUsing the OpenDomePlace the ventilation fan near the opening at the back of the dome (next to the vent
GeoDome Theater Installation and Operation GuideProjection System Equipment ListIn Case1. GeoDome Projector Housing with OmniFocus SX3 projection and